Stephens Bay Retaining Wall – Kaiteriteri
Client
Fulton Hogan.
Location
Stephens Bay, South Kaiteriteri.
Drilling Project Details
We were engaged to drill large diameter boreholes in Weathered Rock.
Then drill, install and test rock anchors for seismic protection. We used our new Yanmar Excavator with several attachments to complete this project.
Drilling Equipment Used
Yanmar V108 Multi-Drill Rig – Various drilling attachments.
Enquiry
Related products
-
Geotechnical – Picton Foreshore
Carry out investigative geotechnical drilling for proposed foreshore development (development is now completed).
-
Drilling – Maitai Pipeline
Drilling and casing through compacted Fill into bedrock using a 300mm Tubex casing advancement system, installation of a bed of cathodic anodes to assist with the long term protection of the new pipeline.
-
Geotechnical Drilling – Deans Head
Two Geotechnical holes required, PQ Cored to 35-40m depth through landslide to assist Geotechnical Engineers. Location required helicopter access so we used our fly rig (QM750).
-
Rock Anchor Installation – Haywards
Assistance was requested to complete drilling and installation of 54 multistrand anchors. Part of the seismic upgrade of Transpower’s Haywards Power Station in the Hutt Valley.