Mine Site Drilling – The Globe, Reefton
Location
The Globe Pit, Reefton
Drilling Project Details
To drill a series of holes to intersect an old mining tunnel/drive, 90m below the bottom of the old Globe Pit.
Once we determined the drive was dry, we placed a series of packers into the holes and cemented to the surface. We used our MP300 drill rig for this project.
Drilling Equipment Used
MP300 Drill Rig.
Result
The drilling was completed on time, within budget, and the holes intersected the drive as per the clients requirements. I find it is always a pleasure returning to work sites where you share a solid working-history.
Enquiry
Related products
-
GNS EIL (Earthquake Induced Landslide) – Kaikoura
Read moreThis project involved multiple boreholes, drilled on active major landslides that occurred during the Kaikoura-Waiau earthquake.
-
Geotechnical Drilling – Nelson Airport
Read moreProject involved a series of drill holes for geotech purposes to determine liquefaction risks for the new Nelson Airport terminal and replacement DVR. Challenges included working in the landing flight path.
-
Horizontal Drilling – Takaka Hill
Read moreRequired to drill and install temporary casing through a variety of formations to allow the installation of 80mm conduit to carry broad band cables for Golden Bay.
-
Drilling – Maitai Pipeline
Read moreDrilling and casing through compacted Fill into bedrock using a 300mm Tubex casing advancement system, installation of a bed of cathodic anodes to assist with the long term protection of the new pipeline.