Investigation Drilling – Reefton
Location
Reefton
Drilling Project Brief
Drill series of deep HQ core holes for slope stability study.
Drilling Project Challenges
Busy industrial mine environment. Negotiate heavy machinery operating
Unstable rock formation overhead
All holes required orientation tooling
Tight time-frame for project completion
Result
Drilling project successfully completed on time (2 days before Christmas).
Enquiry
Related products
-
Geotech Drilling – Tunnel 21 Seddon
Read moreGeotechnical project carried out for T&T and KiwiRail. Due to Kaikoura earthquake this tunnel was damaged and the hill was to be cut down to ‘Daylight the Tunnel’, out work was to identify strata.
-
Geotechnic & Ground Anchor Drilling – Matiri
Read moreProject involved extensive Geotech Drilling to understand the formation of work environment, then drilling and installing RB32 ground anchors through colluvium and into basement rock.
-
Horizontal Drilling – Takaka Hill
Read moreRequired to drill and install temporary casing through a variety of formations to allow the installation of 80mm conduit to carry broad band cables for Golden Bay.
-
Investigation – Mohikinui River
Read moreCarry out investigative drilling to determine strata below the actual river bed.