Investigation – Mohikinui River
Location
Mohikinui River, West Coast
Drilling Project Brief
Carry out investigative drilling to determine strata below the actual river bed.
Drilling Project Challenges
Very short runoff – rapidly rising river, up to 6 metres.
Constant close monitoring of weather patterns.
Ability to mobilise on and off the hole extremely quickly.
Strict environmental constraints.
Implement Health and Safety procedures for operating a small platform on a deep river.
Result
Very successful project. Despite constraints and very challenging conditions it was satisfactorily completed on time and within the set budget.
Enquiry
Related products
-
Geotech Drilling – Tunnel 21 Seddon
Read moreGeotechnical project carried out for T&T and KiwiRail. Due to Kaikoura earthquake this tunnel was damaged and the hill was to be cut down to ‘Daylight the Tunnel’, out work was to identify strata.
-
Bollards – Shakespeare Bay, Picton
Read moreA really interesting project undertaken with Ranui Construction for Ports Of Marlborough. Drilling was in a very tight work-space and at multiple angles to successfully complete the project.
-
Drilling – Maitai Pipeline
Read moreDrilling and casing through compacted Fill into bedrock using a 300mm Tubex casing advancement system, installation of a bed of cathodic anodes to assist with the long term protection of the new pipeline.
-
Geotechnical Drilling – Rocks Road
Read moreDrilling three HQ Core holes to maximum depth 35m, on two adjacent properties to determine structure of upper slope of Rocks Road. This project used our man portable rig (Hydro 200).





