Horizontal Drilling – Takaka Hill
Location
Takaka Hill, Golden Bay
Drilling Project Brief
Required to drill and install temporary casing through a variety of formations to allow the installation of 80mm conduit to carry broad band cables for Golden Bay.
Drilling Project Challenges
Difficult and varied formations made the tooling selection critical – this was imperative to enable drilling and casing reached target location.
Variety of formations – encountered silts, clays broken / fractured limestone, to cavernous limestone.
Very busy and narrow public road.
Borehole accuracy – advanced straight and true, with minimum of 1.0m of cover at exit point.
Result
Excellent final result. 3 crossings completed within budget, and met all the clients exacting specifications.
Enquiry
Related products
-
Geotechnical Drilling – Nelson Airport
Read moreProject involved a series of drill holes for geotech purposes to determine liquefaction risks for the new Nelson Airport terminal and replacement DVR. Challenges included working in the landing flight path.
-
Geotechnical Drilling – Kawarau Gorge
Read moreTwo geotechnical bores of over 50 metres were required. Location was particularly tricky, with one site being 80 metres above the road, while the other was adjacent to the very busy Kawarau Gorge Road.
-
Drilling – Maitai Pipeline
Read moreDrilling and casing through compacted Fill into bedrock using a 300mm Tubex casing advancement system, installation of a bed of cathodic anodes to assist with the long term protection of the new pipeline.
-
Geotechnical Drilling – Rocks Road
Read moreDrilling three HQ Core holes to maximum depth 35m, on two adjacent properties to determine structure of upper slope of Rocks Road. This project used our man portable rig (Hydro 200).