Geotechnical Drilling – Deans Head
Location
Deans Head, Christchurch
Client
Aurecon & Christchurch City Council
Drilling Project Brief
Two geotechnical holes required, PQ Cored to 35-40m depth through landslide to assist Geotechnical Engineers to determine long term stability. Due to the nature of the location we chose to utilise our fly rig (QM750) and needed a helicopter to gain access.
The sites were prepped and drill pads constructed to receive the rig. The rig was flown in by Helipro, with Independent Traffic Services controlling the traffic whilst the rig components were airlifted over the busy main road to the drill site.
Both holes had inclinometers installed at completion.
Drilling Project Challenges
No vehicular access – entrance by foot only.
Very steep terrain in an urban environment.
Management of helicopter operating over a very busy road (traffic management policy).
Unstable and uneven ground conditions.
Result
Project progressed smoothly, a few minor issues, which were to be expected given the challenges.
Enquiry
Related products
-
Geotechnical Drilling – Nelson Airport
Read moreProject involved a series of drill holes for geotech purposes to determine liquefaction risks for the new Nelson Airport terminal and replacement DVR. Challenges included working in the landing flight path.
-
Exploration Drilling – West Coast
Read moreImmediate drilling required in remote and extremely steep country all within typical dense West Coast bush.
-
Geotechnical Drilling – Rocks Road
Read moreDrilling three HQ Core holes to maximum depth 35m, on two adjacent properties to determine structure of upper slope of Rocks Road. This project used our man portable rig (Hydro 200).
-
Geotechnical Drilling – Ferrymead
Read morePQ and HQ core recovery required for a Mass Movement study on a difficult access site in the Bray/Quarry Road area in Ferrymead.