Drilling Project Details
Following another significant weather event, the roading network North of Westport suffered extensive damage. We were engaged to provide Geotech drilling services to gather information to allow Geotech engineers to provide effective engineering solutions.
Project Challenges
Challenges on sites were numerous, these included continuous wet weather, isolated locations, very narrow and restrictive working sites that required full Traffic Management. TM kindly provided by Westreef in Westport.
Drilling Equipment Used
Hanjin 8D Drill Rig – Geotech Drilling.
Enquiry
Related products
-
Geological Drilling – Stanton & Leader Landslides
A series of PQ size core holes through the big landslides after the 2016 earthquakes. ‘Kaikoura EIL Research’ want to understand why this happened to try and help prevent future failures.
-
Seismic Retrofit – Kaiteriteri Home
This project involved the drilling and installation of 36 anchors to stabilise an existing retaining wall and basement of a home in Kaiteriteri, Tasman after Cyclone Gita.
-
Bollards – Shakespeare Bay, Picton
A really interesting project undertaken with Ranui Construction for Ports Of Marlborough. Drilling was in a very tight work-space and at multiple angles to successfully complete the project.
-
Geotechnical Drilling – Ferrymead
PQ and HQ core recovery required for a Mass Movement study on a difficult access site in the Bray/Quarry Road area in Ferrymead.