Exploration Drilling – West Coast
Location
West Coast
Drilling Project Brief
Immediate drilling required in remote and extremely steep country all within typical dense West Coast bush.
Drilling Project Challenges
Very isolated location
Steep and rugged terrain
Demanding geological formation
Very rigid environmental controls
Wet weather factor (project undertaken in winter)
Result
Drilling was successfully completed within tight deadlines.
Enquiry
Related products
-
Retaining Wall – Motueka Valley
Read moreExtensive damage due to Cyclone Gita. Project included earthworks and excavation, large diameter holes for cemented retaining wall posts, drilling and installation of ground anchors to support completed wall.
-
Geotechnical Drilling – Rocks Road
Read moreDrilling three HQ Core holes to maximum depth 35m, on two adjacent properties to determine structure of upper slope of Rocks Road. This project used our man portable rig (Hydro 200).
-
Geotechnical Drilling – Deans Head
Read moreTwo Geotechnical holes required, PQ Cored to 35-40m depth through landslide to assist Geotechnical Engineers. Location required helicopter access so we used our fly rig (QM750).
-
Ground Anchor Installation – Haywards
Read moreAssistance was requested to complete drilling and installation of 54 multistrand ground anchors. Part of the seismic upgrade of Transpower’s Haywards Power Station in the Hutt Valley.