CW Drill

Deep Water Bore – Moutere

Location
Moutere

Drilling Project Details
This was an interesting project with excellent outcome for our client.

The project involved drilling and installation of 120m deep of 150mm steel conductor casing, cementing in place, then drilling to 500m depth through glacial formation to locate a good source of potable water.

Good water located and borehole screened, bore developed over several days, the bore pump tested with excellent results, high flow, great quality water, and one very, very happy customer.

Drilling Equipment Used

Hanjin 35 Multi-Purpose Drill Rig.

Result

The client was extremely satisfied with the end results from this project.

Enquiry