PQ cored holes
Showing all 2 results
-
Geotechnical Drilling – Deans Head
Read moreTwo Geotechnical holes required, PQ Cored to 35-40m depth through landslide to assist Geotechnical Engineers. Location required helicopter access so we used our fly rig (QM750).
-
Geotechnical Drilling – Ferrymead
Read morePQ and HQ core recovery required for a Mass Movement study on a difficult access site in the Bray/Quarry Road area in Ferrymead.

