Fulton Hogan
Showing all 3 results
-
Rock Anchors – Whangamoa Roading Shut-Down
This project involved 1,200 metres of rock anchors due to a significant under-slip at the Rai Saddle end of the Whangamoa Roading shut-down.
-
Anchored Retaining Wall – Shanandoah Highway
A piled and anchored retaining wall to support a near vertical dropout of 7 metres. Challenges included the weather and a very, very restrictive working space.
-
Stephens Bay Retaining Wall – Kaiteriteri
This project involved drilling, installing and testing rock anchors for seismic protection within Weathered Rock on a residential property.