  • Geotechnical Drilling – Deans Head

    Two Geotechnical holes required, PQ Cored to 35-40m depth through landslide to assist Geotechnical Engineers. Location required helicopter access so we used our fly rig (QM750).

    Read more
  • Geotechnical Drilling – Karamea Road

    Drilled 20 boreholes using two different methods, HQ TT Core in cohesive materials, and concentric casing advancement in loose colluvium. All holes were drilled in or above landslide debris.

    Read more
  • Geotechnical Drilling – Kawarau Gorge

    Two geotechnical bores of over 50 metres were required. Location was particularly tricky, with one site being 80 metres above the road, while the other was adjacent to the very busy Kawarau Gorge Road.

    Read more
  • Rock Anchor Installation – Haywards

    Assistance was requested to complete drilling and installation of 54 multistrand anchors. Part of the seismic upgrade of Transpower’s Haywards Power Station in the Hutt Valley.

    Read more
  • Horizontal Drilling – Takaka Hill

    Required to drill and install temporary casing through a variety of formations to allow the installation of 80mm conduit to carry broad band cables for Golden Bay.

    Read more
  • Geotechnical Drilling – Rocks Road

    Drilling three HQ Core holes to maximum depth 35m, on two adjacent properties to determine structure of upper slope of Rocks Road. This project used our man portable rig (Hydro 200).

    Read more
  • Horizontal Drilling – Rocks Road

    Drilling and installation of anchors for a retaining wall. The project required the drilling, installation, grouting, testing, lock off and post grouting of 30 anchors of varing size, to anchor a replacement wall.

    Read more
  • Geotechnical Drilling – Ferrymead

    PQ and HQ core recovery required for a Mass Movement study on a difficult access site in the Bray/Quarry Road area in Ferrymead.

    Read more
  • Drilling – Maitai Pipeline

    Drilling and casing through compacted Fill into bedrock using a 300mm Tubex casing advancement system, installation of a bed of cathodic anodes to assist with the long term protection of the new pipeline.

    Read more
  • Geotechnical – Picton Foreshore

    Carry out investigative geotechnical drilling for proposed foreshore development (development is now completed).

    Read more