Location > Services > Construction

Construction Drilling

 

New world retaining wall, Nelson

Construction drilling primarily involves the installation of rock or soil anchors that are used toretain or stabilise the surrounding landscape prior to building.  The Hydro 200 and HitachiMultiDrill are ideally suited to this type of work.  The Hydro 200 has been designed to fitinside the cage of a Tadano aerial platform, which has a 12m reach.

CW Drill has recently completed aconstruction project, in association with a joint venture between MWH NZ Ltd and Fulton Hogan.


Construction Projects

Nelson Water Treatment Plant:

A joint venture between Fulton Hogan and MWH NZ Limited which required the installation of several hundred rock anchors with galvanised mesh installed.


Nelson City Council:

Drilling and installation of multiple rock anchors for new retaining wall on Stansell Avenue.

Several Retaining Walls completed with multiple Rock Anchors on Cleveland Terrace.


Stewart Island:
Soil Nails/Anchors installed behind the "Red Shed" on Stewart Island.  Project carried out in conjunction with Fulton Hogan/MWH.

Franz Joseph/Whataroa:
Three bores drilled to various depths, for the installation of seismographs.  Project carried out for Victoria University, to continue study of the South Islands main alpine fault.

Nelson:
Large slip failure behind Nelson home.  Required extensive anchoring to retain hillside.  Anchors used in conjunction with macaferri products.  Project undertaken for Swanney Geotechnical.