Nelson Water Treatment Plant:
A joint venture between Fulton Hogan and MWH NZ Limited which required the installation of several hundred rock anchors with galvanised mesh installed.
Nelson City Council:
Drilling and installation of multiple rock anchors for new retaining wall on Stansell Avenue.
Several Retaining Walls completed with multiple Rock Anchors on Cleveland Terrace.
Stewart Island:
Soil Nails/Anchors installed behind the "Red Shed" on Stewart Island. Project carried out in conjunction with Fulton Hogan/MWH.
Franz Joseph/Whataroa:
Three bores drilled to various depths, for the installation of seismographs. Project carried out for Victoria University, to continue study of the South Islands main alpine fault.
Nelson:
Large slip failure behind Nelson home. Required extensive anchoring to retain hillside. Anchors used in conjunction with macaferri products. Project undertaken for Swanney Geotechnical.
|